中文字幕亚洲欧美日韩在线不卡_无码人妻久久一区二区三区蜜桃_国产黄大片在线观看_熟妇高潮喷沈阳45熟妇高潮喷

Company Name Change Announcement:

POWERCHINA Gonghe 50MW Molten Salt Tower CSP Plant

POWERCHINA Gonghe 50MW project is one of China's first batch of CSP demonstration projects, which is located in Gonghe county, Qinghai Province. The project is a tower CSP plant installed with 50MW capacity and 6-hour molten salt storage system, consisting of 30016 sets of 20㎡heliostat. It was synchronized to the grid on September 19th, 2019. 

Cosin Solar is the technology and equipment provider of the solar island and is awarded with commissioning service for the whole plant and subsystems.

POWERCHINA Gonghe 50MW Molten Salt Tower CSP Plant reached full load on Nov 6, 2020.  And the 240-hour trial operation of the plant was completed on Nov 28, 2020, which marks that the plant will be put into commercial operation and performance test period.

Installed Capacity50MW
Storage6 hours
Occupied Land2.13km2
Heliostats600320m2
Receiver Center Height210m
Steam Parameter13.2MPa,540.0℃
Electricity Production 156.9GWH/year